You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
release prep: the sync allowlists build-engine-jars.yml, and test_jvm_payload.py stays out of the upstream pull request #205
The 26.10.1 release rehearsal found two things in the scripts.
The first sync since #141 would prune our own .github/workflows/build-engine-jars.yml, because it was never put on FORK_GITHUB_ALLOWLIST in sync-upstream.sh. The rehearsal had to restore it by hand after the merge.
bindings/python/tests/test_jvm_payload.py crosses into the upstream pull request through make-upstream-pr-branch.sh. It imports benchmarks/experiments/jvm_payload_check.py, which never crosses, so upstream's CI would skip both tests, and its docstring names private filing numbers. It belongs in EXCLUDE_PATHS.
Two crossing workflows cite this repository's issues as bare numbers (issue #10, #12), which read as links to unrelated upstream issues. They get the repository prefix.
Activity
release prep: sync-upstream.sh allowlists build-engine-jars.yml, test…