What is wrong

swebench_pro retries an inconclusive verification on a fresh sandbox
(inconclusive_verification_retries, default 2 β†’ 3 attempts at app.py:350). The one timeout that
exists does not cover most of an attempt, and nothing bounds the attempts in aggregate:

  • evaluation_timeout (shipped as 3600) is passed to run_verification(timeout_s=...), so it
    bounds only the test command inside the sandbox.
  • self._create_sandbox(...) is not covered by it.
  • eval_sandbox.stop() in the finally block is not covered by it.
  • 3 Γ— 3600 s is therefore a legal budget for one rollout β€” more than what remains of a 4 h job.

Because rollout collection ends only when the last rollout does, one instance can hold an entire run
open. Every other rollout can be finished and every GPU idle, and the job still runs to its wall
clock and is killed.

Evidence

A 2193-rollout SWE-bench Pro run on 20 nodes, killed at a 4 h wall with 2192 rollouts complete.
2185 of 2193 were done at 2.22 h; the 2192nd landed at 2.93 h; the last one never did. From ~2:03
elapsed the serving cluster was idle β€” decode reporting Running: 3-7 reqs.

The one unrecorded rollout had finished its agent phase at +0.94 h. Reconstructed from the on-disk
verification artifacts (logs/run_evaluation/<session>/<instance>/ mtimes):

event duration
verification attempt 1 3630 s
verification attempt 2 3641 s
attempt 3 started, ~53 min elapsed when Slurm killed the job

Both completed attempts ran to the full evaluation_timeout and returned; the third was inside
its budget when the wall hit. The rollout consumed 2 h 55 m of verification and was on track for
~3 h 01 m. Nothing hung β€” the budget is simply larger than the job.

For scale, per-rollout verification totals derived from the same artifacts are p50 66 s, p99 461 s,
and the healthy maximum is 735 s. (patch_verification_time_taken in the rollout record is
last-attempt-only β€” app.py overwrites it each attempt and zeroes it on exception β€” so it reports
66/431/735 and is structurally unable to show this failure.)

The instance is not systematically bad: across four runs it has 13 verification sessions, and 12
of them took 115–644 s. The trigger was this rollout's own patch β€” it changes a hook's return
signature across 9 files, the patch applied cleanly, and the jest run started and never terminated.
A model patch that hangs a test suite is normal and expected. Spending three hours on it is not.
That is also why quarantining the instance is not the fix.

What this changes

  • verification_attempt_timeout (default 1200 s) bounds one attempt, sandbox creation included.
    That is ~2.6Γ— the observed p99 of 461 s and above the healthy max of 735 s.
  • verification_total_timeout (default 2700 s) bounds all attempts for one rollout β€” the
    load-bearing cap. Each attempt's ceiling is clamped to whatever is left of it.
  • verification_stop_timeout (default 120 s) bounds the teardown in finally, which would
    otherwise defeat the attempt timeout it runs after.
  • A timed-out attempt takes the existing failure path, so the rollout is scored and recorded.
  • Setting the ceilings to null restores the previous behaviour exactly.

Tests cover a hung attempt, the aggregate budget cutting the retry sequence short, the unset-ceiling
path still using all three attempts, and the clamping arithmetic.
resources_servers/swebench_pro/tests/ is green (48 passed).

Independent confirmation: a replay of the shipped certificate fails the same way

The configuration behind this benchmark's published certificate was re-run unchanged β€” same
container, same Gym pin, same 4P/6D shape on 10 nodes, composed from the published release tag. The
original run of that configuration completed in 3:47:35. The replay TIMED OUT at 04:00:17 with
2192 of 2193 rollouts
.

The single missing rollout was in verification. Its instance has a Retrying verification ... on a new sandbox line in the resources-server log with no successor β€” no "still inconclusive after 3
attempt(s)", no completion β€” and the log stopped writing 22 minutes before the wall.

That is the same signature as the 20-node run described above, five days apart and at a different
node count. Two independent runs now end one rollout short with that rollout inside the retry
budget. It also rules out the alternative explanation we were carrying, that a recent serving-stack
change had caused a throughput regression: the pre-change configuration does not reliably finish
either. Aggregate throughput is not what decides these runs; the verification tail is.

Scope: this does not fix every SWE-bench Pro timeout

Across four TIMEOUT runs of this benchmark, 86 of 89 unrecorded rollouts were sitting in
verification
and 3 were still in the agent β€” so verification dominates. But the proximate causes
differ, and only one of the four is the defect fixed here:

  • 20-node run: one rollout, 2 h 55 m of verification. Without it the job finishes with 59 minutes
    to spare. Fully attributable.
  • Two 10-node runs: missed the wall by 4.0 and 4.2 minutes with 4 and 3 rollouts outstanding.
    Fixing verification perfectly still leaves them short. These are makespan misses.
  • A fourth run: 81 rollouts short, with 56 verification attempts in flight and incomplete at
    the wall, ages 768–1950 s against a p50 of 60 s β€” all within their 3600 s budget. That looks like
    verification-tier contention, not one unbounded rollout. The 1200 s per-attempt default would have
    cut 55 of those 56; the aggregate cap alone would have cut none.

For the benchmark PIC β€” a separate scoring question

On one run, 558 of 2189 rollouts (25.5%) across 225 of 731 instances exhausted all three
attempts and were still inconclusive (360 "N of M graded tests never reported an outcome", 198
"parser reported no tests at all"), and are scored 0.

These look correct rather than buggy: test_stderr.log shows the graded suites failing to compile
against the model's patch (unknown field clientFunc, not enough arguments in call to sess.dial,
Cannot find module ..., [build failed]), 67 of the 225 affected instances have at least one
conclusive rollout elsewhere in the same job and 61 have a reward-1.0 rollout, and retries recover
only 4 of 562 (0.7%) β€” deterministic, not flaky infrastructure.

So this is a scoring-policy question, not a verifier bug: should a rollout whose patch prevents the
graded suite from reporting be scored 0, or excluded and reported as a coverage number? Worth a
decision either way, since it moves a quarter of the sample.

evaluation_timeout bounds only the test command inside the sandbox. Sandbox
creation, sandbox teardown, and the inconclusive-retry sequence as a whole are
unbounded, so a single instance whose verification never returns keeps its
rollout open for as long as the job lives -- and rollout collection ends only
when the last rollout does.

Add verification_attempt_timeout (one attempt, creation included) and
verification_total_timeout (all attempts for one rollout), plus a small ceiling
on the teardown that runs in finally. Leaving both unset preserves the previous
behaviour.

Signed-off-by: Wojciech Prazuch <wprazuch@nvidia.com>
Per-rollout verification totals reconstructed from the run_evaluation artifacts
are p50 66s, p99 461s, healthy max 735s. 1800s sat above the pile-ups actually
observed: on one run 56 verification attempts were in flight and incomplete at
the job's wall clock with ages 768-1950s, all inside their 3600s budget. 1200s
is ~2.6x p99, clears the healthy maximum, and cuts 55 of those 56.

Signed-off-by: Wojciech Prazuch <wprazuch@nvidia.com>
@yaoyu-33 yaoyu-33 added area:environment Individual environments, benchmarks, verifiers, and environment-specific resources servers bug Something isn't working needs-review PR is ready for code review and waiting on a reviewer labels Sep 9, 2026
@yaoyu-33 yaoyu-33 added ready-to-merge PR is approved, current, and waiting for final CI or merge and removed needs-review PR is ready for code review and waiting on a reviewer labels Sep 10, 2026
@yaoyu-33
yaoyu-33 enabled auto-merge (squash) September 10, 2026 05:23
@yaoyu-33
yaoyu-33 merged commit 86e2252 into main Sep 10, 2026
36 checks passed
@yaoyu-33
yaoyu-33 deleted the wprazuch/swebench-pro-bound-verification branch September 10, 2026 05:26
jkyi-nvidia pushed a commit that referenced this pull request Sep 11, 2026
… hold a run open (#3185)

## What is wrong

`swebench_pro` retries an inconclusive verification on a fresh sandbox
(`inconclusive_verification_retries`, default 2 β†’ 3 attempts at
`app.py:350`). The one timeout that
exists does not cover most of an attempt, and **nothing bounds the
attempts in aggregate**:

- `evaluation_timeout` (shipped as `3600`) is passed to
`run_verification(timeout_s=...)`, so it
  bounds **only the test command inside the sandbox**.
- `self._create_sandbox(...)` is not covered by it.
- `eval_sandbox.stop()` in the `finally` block is not covered by it.
- 3 Γ— 3600 s is therefore a legal budget for one rollout β€” more than
what remains of a 4 h job.

Because rollout collection ends only when the last rollout does, one
instance can hold an entire run
open. Every other rollout can be finished and every GPU idle, and the
job still runs to its wall
clock and is killed.

## Evidence

A 2193-rollout SWE-bench Pro run on 20 nodes, killed at a 4 h wall with
2192 rollouts complete.
2185 of 2193 were done at 2.22 h; the 2192nd landed at 2.93 h; the last
one never did. From ~2:03
elapsed the serving cluster was idle β€” decode reporting `Running: 3-7
reqs`.

The one unrecorded rollout had finished its agent phase at +0.94 h.
Reconstructed from the on-disk
verification artifacts (`logs/run_evaluation/<session>/<instance>/`
mtimes):

| event | duration |
|---|---|
| verification attempt 1 | **3630 s** |
| verification attempt 2 | **3641 s** |
| attempt 3 | started, ~53 min elapsed when Slurm killed the job |

Both completed attempts ran to the full `evaluation_timeout` and
**returned**; the third was inside
its budget when the wall hit. The rollout consumed **2 h 55 m** of
verification and was on track for
~3 h 01 m. Nothing hung β€” the budget is simply larger than the job.

For scale, per-rollout verification totals derived from the same
artifacts are **p50 66 s, p99 461 s**,
and the healthy maximum is 735 s. (`patch_verification_time_taken` in
the rollout record is
last-attempt-only β€” `app.py` overwrites it each attempt and zeroes it on
exception β€” so it reports
66/431/735 and is structurally unable to show this failure.)

The instance is **not** systematically bad: across four runs it has 13
verification sessions, and 12
of them took **115–644 s**. The trigger was this rollout's own patch β€”
it changes a hook's return
signature across 9 files, the patch applied cleanly, and the jest run
started and never terminated.
A model patch that hangs a test suite is normal and expected. Spending
three hours on it is not.
That is also why quarantining the instance is not the fix.

## What this changes

- `verification_attempt_timeout` (default 1200 s) bounds one attempt,
sandbox creation included.
That is ~2.6Γ— the observed p99 of 461 s and above the healthy max of 735
s.
- `verification_total_timeout` (default 2700 s) bounds all attempts for
one rollout β€” the
load-bearing cap. Each attempt's ceiling is clamped to whatever is left
of it.
- `verification_stop_timeout` (default 120 s) bounds the teardown in
`finally`, which would
  otherwise defeat the attempt timeout it runs after.
- A timed-out attempt takes the existing failure path, so the rollout is
scored and recorded.
- Setting the ceilings to `null` restores the previous behaviour
exactly.

Tests cover a hung attempt, the aggregate budget cutting the retry
sequence short, the unset-ceiling
path still using all three attempts, and the clamping arithmetic.
`resources_servers/swebench_pro/tests/` is green (48 passed).

## Independent confirmation: a replay of the shipped certificate fails
the same way

The configuration behind this benchmark's published certificate was
re-run unchanged β€” same
container, same Gym pin, same 4P/6D shape on 10 nodes, composed from the
published release tag. The
original run of that configuration completed in 3:47:35. The replay
**TIMED OUT at 04:00:17 with
2192 of 2193 rollouts**.

The single missing rollout was in verification. Its instance has a
`Retrying verification ... on a
new sandbox` line in the resources-server log with no successor β€” no
"still inconclusive after 3
attempt(s)", no completion β€” and the log stopped writing 22 minutes
before the wall.

That is the same signature as the 20-node run described above, five days
apart and at a different
node count. Two independent runs now end one rollout short with that
rollout inside the retry
budget. It also rules out the alternative explanation we were carrying,
that a recent serving-stack
change had caused a throughput regression: the pre-change configuration
does not reliably finish
either. Aggregate throughput is not what decides these runs; the
verification tail is.

## Scope: this does not fix every SWE-bench Pro timeout

Across four TIMEOUT runs of this benchmark, **86 of 89 unrecorded
rollouts were sitting in
verification** and 3 were still in the agent β€” so verification
dominates. But the proximate causes
differ, and only one of the four is the defect fixed here:

- **20-node run:** one rollout, 2 h 55 m of verification. Without it the
job finishes with 59 minutes
  to spare. Fully attributable.
- **Two 10-node runs:** missed the wall by 4.0 and 4.2 minutes with 4
and 3 rollouts outstanding.
Fixing verification perfectly still leaves them short. These are
makespan misses.
- **A fourth run:** 81 rollouts short, with **56 verification attempts
in flight and incomplete** at
the wall, ages 768–1950 s against a p50 of 60 s β€” all *within* their
3600 s budget. That looks like
verification-tier contention, not one unbounded rollout. The 1200 s
per-attempt default would have
  cut 55 of those 56; the aggregate cap alone would have cut none.

## For the benchmark PIC β€” a separate scoring question

On one run, **558 of 2189 rollouts (25.5%)** across **225 of 731
instances** exhausted all three
attempts and were still inconclusive (360 "N of M graded tests never
reported an outcome", 198
"parser reported no tests at all"), and are scored 0.

These look correct rather than buggy: `test_stderr.log` shows the graded
suites failing to *compile*
against the model's patch (`unknown field clientFunc`, `not enough
arguments in call to sess.dial`,
`Cannot find module ...`, `[build failed]`), 67 of the 225 affected
instances have at least one
conclusive rollout elsewhere in the same job and 61 have a reward-1.0
rollout, and retries recover
only **4 of 562 (0.7%)** β€” deterministic, not flaky infrastructure.

So this is a scoring-policy question, not a verifier bug: should a
rollout whose patch prevents the
graded suite from reporting be scored 0, or excluded and reported as a
coverage number? Worth a
decision either way, since it moves a quarter of the sample.

---------

Signed-off-by: Wojciech Prazuch <wprazuch@nvidia.com>
Signed-off-by: Junkeun Yi <jkyi@nvidia.com>

This branch was previously deployed

1 inactive deployment
public β€” 46f7a4c9 Deployed Sep 9, 2026 by copy-pr-bot[bot] via release / finalize / notify #2712
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

area:environment Individual environments, benchmarks, verifiers, and environment-specific resources servers bug Something isn't working ready-to-merge PR is approved, current, and waiting for final CI or merge

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants