Split Suburban Railway
| Split Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The railway uses Swedish-made Y1 units | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Owner | Croatian Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stations | 7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Type | Suburban railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operator | HŽ PutniÄki prijevoz | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rolling stock | HŽ 7122 series | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opened | February 1993 December 10, 2006 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 17.8 km | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Number of tracks | 1 (2) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,435Ā mm (4Ā ftĀ 8+1ā2Ā in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Electrification | To be electrified in the future | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Split Metro (Croatian: Splitski metro) is a suburban railway service in Split, Croatia. The service has been operating on the refurbished existing M604 line since December 10, 2006. It serves seven stations, running from Split centre to KaŔtel Stari. Between June 2019[1] and November 2019 additional services operated between Split and Split-Kopilica.
As of 2019, it is planned that new stations will be added along the tracks and the existing stops renovated. The line runs through two tunnels within the city centre of Split; within the longer of the two tunnels a metro-like station (Split-H.B.Z.) will be opened in 2021 to serve the city centre.[2] The line is 17.8 kilometres (11.1Ā mi) long while an average train ride lasts for 25 minutes. A link with Split Airport (in 2025) and further extension to Trogir is considered, with possible electrification in the long-term.
History
[edit]Most of the railway lines were completed in October 1877, as Split was connected to SiveriÄ via PerkoviÄ. When Split hosted the 1979 Mediterranean Games, an extensive suburban railway system was planned. The existing tracks from the suburbs to the main terminus train station in the harbor were laid underground.[3] As a double-track electrified railway was planned, an underground station Split-H.B.Z. (with a 1,893 m tunnel) was built.[4] A further section of the railway was covered in 1983.[5]
In 1991, the Croatian war of independence broke out. The occupied territory severed the railway links between Split (and Dalmatia) and the rest of Croatia. Between February 1993 and October 1994, Croatian Railways, facing many idle trains and railway workers in Dalmatia, organized a short-lived and ill-fated Split suburban railway from Split to KaŔtela.[6] Local authorities did not support the project while the long-distance rolling stock proved to be unsuitable for suburban traffic.[7] After the war's end in 1995 this project was abandoned.
In December 2006, Croatian Railways reopened the line for suburban traffic,[8] announcing plans to electrify the line and lay a second set of tracks,[7] which still has not happened. Since 2007, CR has intended to refurbish and re-equip the Split railway tunnel and open the underground station Split-H.B.Z.,[9] and a contract was signed between CR and Split authorities,[10] but in late 2015 the City of Split definitely withdrew from the project citing the lack of funds as the main reason.[11] In 2011, HŽ PutniÄki prijevoz, the successor of the Croatian Railways' passenger transport division, struck off one third or 7 daily departures from its timetable, amidst heavy protests and criticism.[12][13][14]
Current state
[edit]The major issues plaguing the line include the distance of the railway tracks (built for long-distance traffic towards Knin and Zagreb) from the population centers along Bay of KaŔtela. Despite the fact that around 35% of Split, 40% of Solin, and 50% of Kastela population lives along the suburban railway, due to the urban sprawl and the lack of spatial planning the surrounding area mostly consists of single-family detached homes with low urban density and poor access to public transport.[15] Together with the lack of railway commuting tradition among the population, this maintains the reliance on personal vehicles for transport. In 2007, the suburban railway served just 57,078 passengers and collected 441,690 HRK in fares.[16] In 2010, railway served 111,000 passengers. Town of KaŔtela 2016-20 traffic strategy called for a better integration of the suburban railway with the public transport, citing poor state of railway infrastructure, its outdatedness, and low quality and safety of suburban rail traffic.[17]
Split PredgraÄe ā Split line sold just 635 tickets from its operation start in early June till June 30, 2019.[18]
Safety
[edit]Since the tracks pass very closely through the suburban area without fences, and the car crossings are frequent, there have been a number of accidents.[19][20] In 2001, a train killed a 19-year-old who was crossing the railway on two-wheel tractor;[20] in 2006 a passenger train killed a man crossing the tracks in his car in KaÅ”tel SuÄurac,[21] In December 2008, train collided with a car, injuring 5 in KaÅ”tel SuÄurac;[22] while in a separate incident cargo train collided with a car, killing one and injuring another in KaÅ”tel LukÅ”iÄ;[23] in February 2009 a man was killed in a collision with a train in KaÅ”tel Gomilica;[24] in April 2010, local train killed a man in DujmovaÄa tunnel,[25] while in November 2012 a 6-year-old girl was killed by a cargo train in KaÅ”tel Gomilica;[26] in May 2013 in KaÅ”tel Å tafiliÄ a man was hit by train and both of his legs were amputated;[27] in January 2015 a long-distance train killed a woman in KaÅ”tel Gomilica,[28] in February 2016 passenger train hit a wild boar near Sadine,[29] in December 2016 man died in hospital from injuries sustained on a railway in KaÅ”tel SuÄurac,[30] in March 2017 in KaÅ”tel LukÅ”iÄ train collided with a car,[31] which happened twice in April 2017, in Sadine[32] and in KaÅ”tel Gomilica,[33] respectively; in July 2017 a man was hit and killed by a passenger train in KaÅ”tel Kambelovac.[34] In October 2018 a train collided with a horse in KaÅ”tel LukÅ”iÄ.[35] In December 2019, Kastela-Split line train derailed,[36] in January 2020 a man was injured when train collided with his car in SuÄurac,[37] while in February 2020 a cargo train collided with a car, injuring 2 in Kastel Luksic.[38] In November 2020 a motorcycle driver was severely injured by a train in Kastel Luksic.[39] On February 28th, 2026, a 17-year-old boy died from injuries sustained when he was hit by a train in a tunnel at the main railway station.[40]
Operations
[edit]
Kastel Stari ā Split
[edit]The KaÅ”tel StariāSplit route is served by 17 trains daily in each direction on the weekdays and 8 trains during the weekend.[41] HŽ PutniÄki prijevoz operate refurbished Y1 diesel multiple units and new HŽ 7023 diesel multiple units on the track. Several times a day bus connection runs between Split airport/Trogir and Kastel Stari railway station, aligned with the train schedule.
Kopilica ā Split
[edit]Split-PredgraÄe (Kopilica) ā Split line was served by 27 trains daily in each direction on the weekdays. Just one HŽ 7023 diesel multiple unit ran on the line.[18] Its use caused disruption on lines towards Kastela and Perkovic. In early November 2019, Split (Kopilica) ā Split (Harbor) services were discontinued in favor of better integrating Kastel StariāSplit line.[41]
Planned development
[edit]Due to the frequent traffic bottlenecks, jams, and the rapid increase in passenger traffic at the nearby Split Airport (doubling between 2013 and 2017 to 3 million passengers, increasing further at a 23% annual rate), the Split Suburban railway is planned to be extended for roughly 12ā14Ā km (7.5ā8.7Ā mi) further, beyond KaÅ”tel Stari to Split Airport and running to Trogir as an end station. Some older studies from 2000[42] and 2003[43] also envisaged extending the line eastward, but this has since been dropped.
In 2006, Marijan KlariÄ, deputy CEO of HŽ PutniÄki prijevoz, announced the plans to overhaul the Split suburban railway, electrify the lines, add another set of tracks and extend the line to Trogir, but nothing happened.[44] HŽ PutniÄki prijevoz invited the town of Split to work together on defining the new Trogir-Airport-Split railway in 2014.[45] In 2017, a conceptual design study for the line was published. It probed into two different paths (north and south from D8 road), estimating that two viaducts and one tunnel should be built for the line. KaÅ”tel Kambelovac, Split Airport and Trogir train stations would also be built from scratch. Split-Trogir line would have an annual capacity of 5.6 million passengers. The calculations estimated the cost at 500 million kuna.[46]
2017
[edit]In August 2017, commemorating the anniversary of the re-establishment of the railway traffic between Split and the continental Croatia after the war in 1995, Split mayor KrstuloviÄ Opara announced the construction of the railway to Split Airport as "everyone's dream", vowing "not to stop" until the line is completed.[47] In October 2017, after expressing the importance of this project,[48] Split mayor met with local counterparts in KaÅ”tela to discuss the development. KaÅ”tela mayor Denis IvanoviÄ stated that this line would be the most profitable railway line in Croatia.[49]
2018
[edit]After a series of traffic jams on the route between Kastela and Split in March 2018, mayor KrstuloviÄ Opara cited them as a further proof that the road traffic is overwhelmed and that a new railway was necessary.[50] Mayor's opposition, Split social democrats, also supported the new railway.[51] On April 17, 2018, Split's mayor met with mayors of KaÅ”tela, Solin and Trogir, HŽ PutniÄki prijevoz chair, HŽ Infrastruktura board member, as well as Split Airport director, Port authority, and the national Ministry of Maritime Affairs, Transport and Infrastructure representatives to discuss the project.[52] The railway was deemed especially important in order to link the Split Airport to the Port of Split (next to the current Split main station) due to many of the 3 million airport passengers travelling to the Dalmatian islands. The integration and intermodality of the public transport of the Split region with a population of 300,000 was another important goal. Split-Kopilica was mentioned as an intermodal transport hub in order to alleviate the burden on the current Central Train Station in Split harbor, something advocated as early as 1939.[53] HŽ PutniÄki prijevoz strongly supported the project, while the Ministry of Transport would finance the feasibility study. KaÅ”tela and Trogir mayors stated that the general urban plan changes with respect to the new rail line have been ongoing in their jurisdictions. Split Airport and Port of Split directors expressed their intention to co-finance the project.[54]


Under the auspices of the Croatian Chamber of Commerce and its vice president Mirjana Äagalj, on April 30, 2018, a memorandum establishing the multiyear partnership on Split area rail passenger traffic development was signed between the CR, local authorities, national ministry, and other stakeholders in the project.[55][56][57] Two possible routes for the new line to Trogir were mentioned. The first one would branch off from the existing tracks from Kastel Stari to Divulje and further to Trogir. This would mean 7Ā km (4.3Ā mi) of new tracks of which 3.4Ā km (2.1Ā mi) would be underground. The section between KaÅ”tel Stari and Divulje would cost ā¬70 million, while the section between Divulje and Trogir would cost between ā¬30 and 80 million. The second route would branch off from KaÅ”tel SuÄurac, requiring 12.6Ā km (7.8Ā mi) of tracks (11.6Ā km (7.2Ā mi) underground). The latter would cost ā¬200 million just to reach Divulje.[58] The case and development study planning would take 3ā5 years, while the construction of the railway itself another 3ā6 years. 8 train compositions would be bought for this line; KonÄar representatives presented the diesel multiple unit HZP 7-023 series to the stakeholders. Rail-workers' trade union representatives supported investing in the Split suburban rail network as a way to improve HŽ PutniÄki prijevoz's sustainability, profits, and mission fulfillment.[59]
The Government of Croatia officially supported the project in a cabinet meeting held in Split on May 4, 2018. HŽ Infrastruktura was appointed as a key stakeholder, Ministry of Transport as a coordinator among the stakeholders and the local authorities, while the total cost was estimated at ā¬1.1 billion. However, the Croatian government spoke solely of connecting the Split Airport with the Port of Split and building Split-Kopilica as an intermodal hub. The plans for extending the line to Trogir were dropped.[60] This was reaffirmed on July 17, 2018, by the minister of transport Oleg ButkoviÄ at the ceremonial opening of Äiovo bridge, stating that connecting Split Airport with the Port of Split by rail is the most important railway project in Croatia.[61]
A new study on the proposed Split-Kastela-Airport-Trogir railway was published in the railway engineering journal in June 2018. It probed into the feasibility of two options: either linking the Split airport/Trogir with the existing M604 railway from KaÅ”tel Stari (8Ā km (5.0Ā mi) track) on far west end of the urban area or from KaÅ”tel SuÄurac, very close to Split proper (12.6k. The latter would effectively create a proper suburban rail line connecting the entire Kastela area with Split, airport, and Trogir. The former would cost around 100-150 million euros, while the latter would cost 230-280 million due to the longer track and the route complexity (a tunnel underneath the D-8 road).[62]
At a July 19 on-site meeting with the Split area mayors and the state secretary for transport, the CEO of HŽ PutniÄki prijevoz declared the opening of the new stations on the existing track (Split-H.B.Z.,[63] Split-DujmovaÄa,[64] and Solin-Å irine[64]) to be the first step to follow. CR will draft the studies and necessary documents for the new line and new stations (Sv. Kajo,[63] KaÅ”tel LukÅ”iÄ, Rudine, and Split Airport) in parallel. The feasibility study will be financed by the EU competitiveness and cohesion fund.[64] The path of the new extended track and the point where it will branch off from the existing Split-Knin-Zagreb railway is yet to be defined. Split mayor emphasized the need to refurbish the railway infrastructure not only for the suburban traffic, but also for the more efficient railway link between Central Europe and Zagreb, and Split and Dalmatia.[65]
On September 30, Split county prefect commented that the renovation and reconstruction of the existing M604 line section Split-Kastel Stari (Rudine) would commence already in 2019, with the construction of the link between the M604 and Split Airport / Trogir starting in 2021.[66] This would imply the preference for the simpler solution instead of the new line running through/underneath Kastela proper. In November, a Kastela-based NGO came in favour of the new track through Kastela proper due to its commuting nature.[67]
In December 2018, public stakeholders and local authorities together with HŽ PutniÄki prijevoz agreed on relocating the main railway hub and (temporarily)[68] a new central bus station to Kopilica station (officially Split Predgrade), where a Park and Ride spot will be built as well. The construction was planned to finish in three months time, by June 2019. The lease for the property was also signed. The intention is to bring the commuting, long-distance bus and tourist traffic to Kopilica and then channel it onto Split urban metro, terminating at the current Main Railway Station in Split harbour. Trains between Kopilica and Split Main Station would run each 10 minutes and the ride would last for 3 minutes. Starting from March 2019, CR will open three new stations (Split-DujmovaÄa, Sveti Kajo and Solin-Å irine) on the existing line, adding more commuters further out of the city, north from Kopilica. The existing pre-determined spot in railway tunnel between Kopilica and Split Main Station will be equipped and opened as an underground Split-H.B.Z. station.[69] Split authorities will stimulate bus operators to use Kopilica (Split-Predgrade) as their terminal by charging 700-800kn per entry to the inner city center.[70] News portal T-Portal and Slobodna Dalmacija local daily also reported that the "north" option to connect the Airport to M604, with a route avoiding Kastela, was the most likely solution in the long term.[68] The design and the plan of the new temporary bus station / intermodal hub, the lack of plans of electrifying the existing track, leading to the difficulty of opening Split-H.B.Z. underground station amidst diesel exhaust fumes, and avoiding connecting Kastela commuting population to the suburban railway were criticized in the daily press[71] as well as by the members of the Split City Council. Answering questions regarding electrification and timing of the construction, Split deputy mayor Nino Vela stated at a Council meeting that electrification was discussed with HŽ Infrastruktura. However, this would require substantial investments and construction of a major traction substation. The opening and integration of first five stations will be prioritized, with the construction of the Split-H.B.Z. underground station to start in 2020.[72] Split chamber of architects (DruÅ”tvo arhitekata Split) publicly criticized and rejected both the design and the temporary nature of Kopilica intermodal transport hub.[73] The opposition in Split city council pointed at unresolved legal and real estate ownership issues around Kopilica station (Split-Predgrade).[74][75][76]
2019
[edit]The City of Split published a tender for the (re)construction of temporary Kopilica hub, planning to spend 5 million HRK, but only one company replied and submitted an offer, estimating the cost at over 14 million HRK.[77][78] Due to the cost discrepancy, city authorities cancelled the call for bids and announced a launch of a new one.[79] A new bid was launched on 25 January, reducing the construction work deemed necessary (reducing P+R parking places and canopies),[80] and increasing the expected cost by more than 30%.[81] Split mayor Krstulovic-Opara stated in an interview to Vecernji list on January 19 that his priority is to connect Trogir, Kastela, Solin and Split agglomeration with rail.[82]

In January 2019, internet news portal T-portal reported that the feasibility study (contrary to the earlier studies, such as that of MatiÄ, Nosal and Mikec from 2018) concluded that the 8Ā km (5.0Ā mi) connection between KaÅ”tel Stari station (on the existing M604 tracks) via Rudine to Split Airport, bypassing Kastela proper, is the most favourable solution to integrate the airport onto the suburban railway. Its construction is planned to finish by 2025ā6.[70] People living in the buildings around Kopilica station expressed their disapproval for the plans.[83] The January issue of GraÄevinar, journal of the Croatian Association of Civil Engineers, reported that the planned route to Split Airport will branch off earlier, from KaÅ”tel Kambelovac station, running along D58 and thus through KaÅ”tela proper.[84]
Civil engineers of Split criticized the way forward regarding Kopilica hub. City representatives announced that one train operating every 10ā12 minutes in peak hours will serve the line, while they are negotiating the addition of a second train.[85] Split chamber of architects president criticized the lack of development studies and any traffic impact studies.[86] In mid-February, two companies submitted their bids for the construction tender for temporary Kopilica hub.[87] Together with the construction supervision, costs of refurbishing Kopilica hub were estimated at 11 million HRK,[88] while the reconstruction of adjacent Hercegovacka street, started in February, cost additional 2.2 million.[89] Bid was awarded to ÄitiÄ gradnja.[90] Citizens living in 52 households around Kopilica [split-Predgrade] station, heavily concerned about the plans, lack of transparency, and their future life quality around the hub and the bus/train station,[91] organized a protest.[92][93][94] The opposition in Split council called for the plans of a temporary hub in Kopilica to be scrapped and a proper architectural and urban planning solution to be devised, estimating the time frame unrealistic.[95] In March it was reported that the rail tunnel does not have the necessary permits, which would result in shelving the plans for the Split-H.B.Z. metro station, but the city administration dismissed those claims.[96] In a town hall meeting, Split city representatives claimed that the frequency of trains running between Kopilica hub and Split Main Station will follow from the needs as defined by the city administration and that HŽ Infrastruktura have already started refurbishing Rudine station.[97] Split chapter of the Croatian Chamber of Commerce presented the plan for connecting Split Airport through Kopilica with the city center to airport management in an on-site March 14 meeting.[98]
In mid-March, Split city administration presented the first draft of the EBRD co-financed masterplan concerning urban redevelopment, dubbed "Split United." The plan includes light-rail connecting Split airport to Split harbor via Kopilica hub.[99] An electrified rail line connecting the two is seen as a crucial factor.[100] The funds for electrification of the existing rail line and the construction of the new segment are planned to be sought in EU cohesion funds between 2020 and 2027.[101] State secretary in the Ministry of transport, T. MihotiÄ, remarked that the goal is to connect Trogir to the railway as well, while the electrification timeline is not on the table as this line is not on the priority list of HŽ Infrastruktura.[102] Split Main Railway Station, located on the eastern part of Split harbour, was proposed to be retained as a terminus, dug in underground and refurbished.[103] These plans were heavily criticized by mayor heading the preceding city administration.[104]
On March 20, Croatian minister for transport and infrastructure Oleg Butkovic visited Split Airport and stated that the 7 km (4.3 mi) of new tracks necessary to connect the airport to Split with rail are in the planning process by HŽ Infrastruktura and that he hopes that the work will commence in 2021.[105]
In early April, HŽ Infrastruktura published an open bid for plans to renovate the railway tunnel and to build an underground station "Split-H.B.Z." inside of it.[106] The plan foresees exclusive use of diesel trains in the tunnel.[107]
| External image | |
|---|---|
In September it was reported that, out of three proposed options, Kastela city administration supported the railway line extension from Kastel Kambelovac as opposed to branching off further away, at Kastel Stari station (ā¬300 million), despite the higher cost. However, Kastela mayor wanted to probe into digging the line underground, which was deemed too expensive.[108] Additionally, Kastela mayor also proposed changes to the latter layout option (branching off from Kastela Stari station / Rudine hamlet), citing conservation and agriculture damage as main reasons.[109] In October, deeming Kastela proposal too difficult as it contains high elevation, HŽ Infrastruktura came back to the Ministry of Transport with yet another layout proposal. The new tracks would branch off from Kastel Kambelovac and would be built on pillars between the D8 road dual carriageway. CR-Infrastructure claimed that this option would be cheaper than digging the rail underground, the construction would cause less interruption, and there would be no legal or expropriation issues.[110]
2020
[edit]In March 2020, HŽ Infrastruktura board member Darko BariÅ”iÄ presented ongoing plans to local stakeholders. They would invest 3,6 million HRK in reconstruction of Split-Predgrade station; further 7,5 million will be spent on building new stations (DujmovaÄa, Solin-Å irina and Sveti Kajo), with construction work to commence in spring 2020. Underground station Split - HBZ was estimated to cost 60 million. Rudine, a new station where the new railway to Split Airport and further to Trogir would branch off from M604, is yet to be planned pending the selection of the optimal route after the feasibility study. Barisic said CR are to electrify the line.[111]
Since 2020
[edit]No progress has been made since 2020. The construction of the Split-HBZ station was to be completed in 2021. As of 2022[update], the construction works have not begun.
In 2021, Ivica Puljak was elected mayor of Split, defeating Vice MihanoviÄ, the candidate of Croatia's ruling HDZ party. During the election campaign, the Split metro was completely out of focus. As of 2022[update], it's still out of focus. Neither local nor national politicians talk about it.
Map
[edit]References
[edit]- ā "KreÄe splitski 'metro'! Vožnja Äe trajati Äetiri minute, a karta Äe vrijediti i za bus". Slobodna Dalmacija (in Croatian). 15 May 2019. Retrieved 21 May 2019.
- ā "Split veÄ iduÄe godine dobiva 'mini metro', prvi u Hrvatskoj! Evo kuda Äe prometovati posebna linija, od Kopilice do luke stizat Äe za samo nekoliko minuta". Slobodna Dalmacija (in Croatian). Retrieved 25 October 2018.
- ā Nikolic, Leo. "Pogled u proÅ”lost za bolju buduÄnost". tportal.hr. Retrieved 5 June 2018.
- ā LeÅ”, Goran (27 December 2013). "Splitska podzemna željeznica - splitski.portal". splitski.portal. Retrieved 17 April 2018.
- ā "Donosimo nikad viÄene fotografije splitskog podzemnog metroa; Inženjeri koji su sudjelovali u tom mega projektu prisjeÄaju se 'ukopa pruge' poÄetkom 80-ih". Slobodna Dalmacija (in Croatian). 2 January 2019. Retrieved 6 January 2019.
- ā KlariÄ, Nenad (2009). "PRIGRADSKI ŽELJEZNIÄKI PROMET NA PODRUÄJU SPLITSKE KONURBACIJE"
- 1 2 "Ministarstvo pomorstva, prometa i infrastrukture - Promet - Prigradskim vlakom od Splita do KaŔtela". www.mppi.hr. 2006. Retrieved 17 April 2018.
- ā "KaÅ”tela i Split povezao vlak - Jutarnji List". www.jutarnji.hr. Retrieved 13 April 2019.
- ā Vidulic (January 2013). "HŽ bi uredio tunel, ali Grad ne da lokacijsku". Slobodna Dalmacija (in Croatian). Retrieved 17 April 2018.
- ā "Grade se željezniÄke postaje u srediÅ”tu Splita". www.poslovni.hr. Retrieved 23 January 2019.
- ā "Umjesto željeznice - podzemna željeznica Kopilica - trajektna luka sa stanicom kod suda". www.popravigrad.com (in Croatian). Retrieved 17 April 2018.
- ā "HŽ prevario KaÅ”telane i ukinuo sedam polazaka". Slobodna Dalmacija (in Croatian). 13 December 2011. Retrieved 13 April 2019.
- ā "PROSVJED Redukcija linija vodi k potpunom ukidanju vlaka!". Slobodna Dalmacija (in Croatian). 30 November 2011. Retrieved 13 April 2019.
- ā "Neka HŽ smanji broj svojih direktora, a ne linije za KaÅ”tela". Slobodna Dalmacija (in Croatian). 3 November 2011. Retrieved 13 April 2019.
- ā MartiniÄ, Ivica. "VRIJEDI JOÅ JEDANPUT PROÄITATI: Prije dvije godine struÄnjak iz Banovine je upozorio da Splitu prijeti potpuni prometni kolaps". Dalmatinski portal. Retrieved 5 July 2018.
- ā Klaric (2009), p. 6
- ā STRATEGIJA RAZVOJA GRADA KAÅ TELA 2016. ā 2020., Meta consulting, 2016., pp. 94-5
- 1 2 "Totalni fijasko splitskog 'metroa': i putnici koji su danas kupili karte gorko su požalili..." Slobodna Dalmacija (in Croatian). July 2019. Retrieved 2 July 2019.
- ā JuriÄ, Mirjana. "Željeznice siju smrt u KaÅ”telima". Kastela.org (in Croatian). Retrieved 14 April 2019.
- 1 2 "Pruga smrti u KaŔtelima: koliko joŔ ljudi treba umrijeti?". Slobodna Dalmacija (in Croatian). 13 December 2008. Retrieved 14 April 2019.
- ā MarkoviÄ, Ivica. "Zbog nestalog znaka poginuo pod vlakom". Kastela.org (in Croatian). Retrieved 7 February 2020.
- ā "Vlak naletio na vozilo - ozlijeÄeno pet osoba". tportal.hr. Retrieved 13 April 2019.
- ā "KaÅ”tela: Vlak je naletio na auto, poginuo muÅ”karac". 24sata (in Croatian). Retrieved 14 April 2019.
- ā "U KaÅ”tel Gomilici vlak pregazio muÅ”karca". www.index.hr (in Croatian). Retrieved 13 April 2019.
- ā "PutniÄki vlak u tunelu naletio na pjeÅ”aka". Net.hr (in Croatian). 12 April 2010. Retrieved 13 April 2019.
- ā "StrojovoÄa trijezan, istražuje se odgovornost roditelja". Slobodna Dalmacija (in Croatian). 11 November 2012. Retrieved 13 April 2019.
- ā "Podstrana portal - KaÅ”tela: vlak mu odsjekao obje noge, u teÅ”kom stanju prevezen u KBC Split". podstrana-tv.com (in Croatian). Retrieved 13 April 2019.
- ā D.P. "Vlak usmrtio ženu u KaÅ”tel Gomilici (FOTO)". Kastela.org (in Croatian). Retrieved 13 April 2019.
- ā "Nagibni vlak kod KaÅ”tela udario u - divlju svinju". Slobodna Dalmacija (in Croatian). 11 February 2016. Retrieved 13 April 2019.
- ā "MuÅ”karac pronaÄen uz prugu u KaÅ”tel SuÄurcu, preminuo u splitskoj bolnici". www.vecernji.hr (in Croatian). Retrieved 13 April 2019.
- ā "Prometna nesreÄa u KaÅ”tel LukÅ”iÄu: putniÄki vlak naletio na osobni automobil". Slobodna Dalmacija (in Croatian). 15 March 2017. Retrieved 13 April 2019.
- ā "Vlak naletio na automobil, vozaÄica pobjegla u zadnji tren!". Slobodna Dalmacija (in Croatian). 19 April 2017. Retrieved 13 April 2019.
- ā "Vlak u KaÅ”telima naletio na automobil!". Slobodna Dalmacija (in Croatian). 12 April 2017. Retrieved 13 April 2019.
- ā "StraviÄna nesreÄa u KaÅ”telima: vlak naletio na muÅ”karca i na mjestu ga usmrtio". Slobodna Dalmacija (in Croatian). Retrieved 13 April 2019.
- ā "Vlak naletio na konja u KaÅ”tel LukÅ”iÄu, nesretna životinja ostala zaglavljena pod lokomotivom". Slobodna Dalmacija (in Croatian). 3 October 2018. Retrieved 13 April 2019.
- ā "[VIDEO] Nova nesreÄa: U rano jutro vlak izletio iz traÄnica u KaÅ”telima". tportal.hr. Retrieved 6 February 2020.
- ā "VozaÄ proÅ”ao bez ozljeda, vlak smrskao auto u KaÅ”tel SuÄurcu". www.24sata.hr (in Croatian). Retrieved 6 February 2020.
- ā "Slobodna Dalmacija - TeÅ”ka prometna nesreÄa u KaÅ”telima: teretni vlak naletio na osobno vozilo, dvije osobe prevezene u splitsku bolnicu; U tijeku je policijski oÄevid". slobodnadalmacija.hr (in Croatian). 6 February 2020. Retrieved 6 February 2020.
- ā "Objava za javnost - AIN". www.ain.hr. Retrieved 16 November 2020.
- ā "Split: Umro 17-godiÅ”njak kojega je udario vlak". vijesti.hrt.hr (in Croatian). Croatian Radiotelevision (HRT). 28 February 2026.
- 1 2 "Evo Å”to kaže splitski gradonaÄelnik na pitanje je li metro bio isplativ: "Ne možemo govoriti o plusu ili minusu..."". Splitski Dnevnik (in Croatian). 4 November 2019. Retrieved 8 November 2019.
- ā GranÄiÄ, Jozo. (2000) "Osnovne pretpostavke za funkcioniranje prigradske željeznice na Splitsko-kaÅ”telanskom podruÄju". ITHZ, 7(11)
- ā Antun, StipetiÄ; Nenad, KlariÄ; Slavko, Å eriÄ (25 September 2003). "Traffic and Technological Solution of the Urban and Suburban Railways of the City of Split". Promet - Traffic&Transportation. 15 (5). ISSNĀ 0353-5320.
- ā "SpliÄani Äe vlakom putovati do Trogira". jutarnji.hr. Retrieved 3 July 2018.
- ā KOHAREVIÄ, Ojdana. "HŽ: Split pripajamo Rijeci jer se broj putnika prepolovio". Slobodna Dalmacija (in Croatian). Retrieved 22 August 2018.
- ā Maja, Ahac; Stjepan, LakuÅ”iÄ; Mate, IvanÄev; Ana, Äudina (2017). "Idejno rjeÅ”enje željezniÄke pruge Split ā Trogir". Željeznice 21 (in Croatian). 16 (2). ISSNĀ 1333-7971.
- ā "Vlak slobode se vratio u Split, od Labina do KaÅ”tel Starog se vozi sporije da ne bi iskre od koÄenja izazvale požar". Dalmatinski portal. Retrieved 24 April 2018.
- ā "SEEbiz.eu / RS / KrstuloviÄ Opara: Splitska zraÄna luka i Jadrolinija trebaju viÅ”e ulagati u Split". rs.seebiz.eu. Retrieved 7 May 2018.
- ā "IvanoviÄ: ŽeljezniÄka pruga od ZraÄne luke do KaÅ”tel Starog bila bi najisplativija u Hrvatskoj!". Dalmatinski portal. Retrieved 17 April 2018.
- ā "Padaju glave u Hrvatskim cestama: Opara tražio smjene u zbog gužvi na ulazu u Split, otkaz dobio voditelj ispostave". Slobodna Dalmacija (in Croatian). Retrieved 17 April 2018.
- ā "Goran Kotur ponudio rjeÅ”enje za prometne gužve". Dalmatinski portal. Retrieved 28 June 2018.
- ā "'Split Äe postati najveÄe gradiliÅ”te u Hrvatskoj': brza željezniÄka linija povezivat Äe zraÄnu i trajektnu luku, u tijeku su pripreme za realizaciju ovog važnog projekta". Slobodna Dalmacija (in Croatian). Retrieved 17 April 2018.
- ā "Split ā komunalno stanje na razini uspjeha Hajduka" (in Croatian). Retrieved 5 November 2018.
- ā "GradonaÄelnici Äetiriju gradova i župan s predsjednikom HŽ putniÄkog prijevoza i državnim tajnikom oko gradske željeznice". Solin Live (in Croatian). 18 April 2018. Retrieved 24 April 2018.
- ā "KaÅ”telanski Resnik povezuje se s Splitom željeznicom". Kastela (in Croatian). 30 April 2018. Retrieved 7 May 2018.
- ā "Vlakom od zraÄne luke do Splita". Retrieved 3 May 2018.
- ā "'Moramo ljude izbaviti iz prometne izolacije, sve je stvar politiÄke volje': splitski gradonaÄelnik najavio pokretanje velikog projekta željeznice od trajektne luke do aerodroma". Slobodna Dalmacija (in Croatian). Retrieved 3 May 2018.
- ā Bohutinski, Josip (3 May 2018). "Vlakom od trogira preko aerodroma do Splita za 40 minuta". VeÄernji list.
- ā "U zaÄaranom cugu". portalnovosti.com. Retrieved 30 May 2018.
- ā Prijedlog zakljuÄka u vezi s realizacijom Projekta povezivanja brzom prigradskom željeznicom kolodvora Split, u trajektnoj luci Split (IstoÄna obala), sa ZraÄnom lukom Split te izgradnja intermodalnog Ävora novog glavnog kolodvora Split (Kopilica)
- ā "POVIJESNI DAN ZA TROGIR: Pogledajte kako je bilo na otvaranju Äiovskog mosta". Dalmatinski portal. Retrieved 19 July 2018.
- ā Matic, Nikola; Nosal, Ivan; Mikec, Emil (June 2018). "NOVA ŽELJEZNIÄKA PRUGA KAÅ TELA ā ZRAÄNA LUKA SPLIT ā TROGIR" (PDF). Željeznice 21. 17 (2): 7ā15.
- 1 2 "RADNI SASTANAK U VAGONU: Razgovaralo se o željeznici koja Äe povezati Resnik s Trajektnom lukom". Dalmatinski portal. Retrieved 23 July 2018.
- 1 2 3 "Projekt splitske gradske željeznice od aerodroma do trajektne luke opet aktualan: 'NaÅ”ih 350 tisuÄa graÄana zaslužuje bolji prijevoz'". Slobodna Dalmacija (in Croatian). Retrieved 23 July 2018.
- ā "Obilazak trase buduÄe moderne željeznice od Splita do Resnika". www.split.hr. Retrieved 23 July 2018.
- ā "Blaženko Boban: Do kraja godine poÄinju radovi na mostu preko Cetine, promet Äemo maknuti s magistrale i rijeÅ”iti problem gužvi u Splitu i OmiÅ”u". Slobodna Dalmacija (in Croatian). Retrieved 25 October 2018.
- ā D.P. "Udruga Savez za KaÅ”tela otvorenim pismom obratila se gradonaÄelniku i gradskim vijeÄnicima te zatražila njihovo aktivno ukljuÄivanje u projekt prigradske željeznice Split - zraÄna luka" (in Croatian). Retrieved 21 November 2018.
- 1 2 "Vožnjom probnog vlaka u srijedu se predstavlja projekt splitskog 'mini metroa'". tportal.hr. Retrieved 18 December 2018.
- ā "Splitski autobusni i željezniÄki kolodvor od iduÄeg ljeta bit Äe na Kopilici, pogledajte kako Äe izgledati". Slobodna Dalmacija (in Croatian). 12 December 2018. Retrieved 18 December 2018.
- 1 2 "Split Äe ulazak turistiÄkih autobusa u centar grada naplaÄivati i do 800 kuna". tportal.hr. Retrieved 7 January 2019.
- ā "Ivan MrvoÅ” kritizirao privremeno rjeÅ”enje splitskog kolodvora na Kopilici: 'To nije dostojno ni najgoreg sela u Zimbabveu'; Inovator besplatno ponudio svoju vizualizaciju, evo kako on zamiÅ”lja Kopilicu". Slobodna Dalmacija (in Croatian). 17 December 2018. Retrieved 18 December 2018.
- ā "Grad izveo "fintu", kolodvor na Kopilici Äe se graditi bez izmjena prostornog plana: "To je ipak korak naprijed"". Splitski Dnevnik (in Croatian). 19 December 2018. Retrieved 20 December 2018.
- ā "DruÅ”tvo arhitekata Splita osvrnulo se na kolodvor na Kopilici: To je improvizacija ispod svakog nivoa, posljedice Äe biti skupe i dalekosežne!". Slobodna Dalmacija (in Croatian). 28 December 2018. Retrieved 6 January 2019.
- ā "Splitsko-dalmatinski SDP traži objaÅ”njenja o premjeÅ”tanju kolodvora u Kopilicu - Jutarnji List". www.jutarnji.hr. 10 January 2019. Retrieved 21 January 2019.
- ā "Blaževski: Za kolodvor u Kopilici je trebalo pripremiti teren zato je veÄ na poÄetku provedbe dovedena u pitanje zakonitost projekta". Dalmatinski portal. Retrieved 24 January 2019.
- ā ""Kako se za kolodvor misli preurediti zgrada koja nije legalna?": Dotaklo se i teme za privremeno rjeÅ”enje autobusnog i željezniÄkog kolodvora u Kopilici". Splitski Dnevnik (in Croatian). 29 January 2019. Retrieved 30 January 2019.
- ā "'Privremeni' kolodvor na Kopilici koÅ”tat Äe tri puta viÅ”e nego je predviÄeno! Na natjeÄaj se javila samo jedna firma, je li problem u kratkom roku ili...?". Slobodna Dalmacija (in Croatian). Retrieved 21 January 2019.
- ā "PRESKUPA PRIÄA: PoniÅ”tit Äe se natjeÄaj za izvoÄaÄa radova za izmjeÅ”tanje kolodvora na Kopilicu?". Dalmatinski portal. Retrieved 21 January 2019.
- ā "PoniÅ”tava se natjeÄaj za kolodvor na Kopilici, uskoro se raspisuje novi! Doznajemo Å”to stoji iza odluke Grada Splita". Slobodna Dalmacija (in Croatian). 22 January 2019. Retrieved 22 January 2019.
- ā Å uÅ”ak ŽivkoviÄ, Živana. "RASPISAN NOVI NATJEÄAJ: Cijena privremenog kolodvora u Kopilici Äe biti veÄa, a radova - manje!". Dalmatinski portal. Retrieved 25 January 2019.
- ā "Raspisan novi natjeÄaj za kolodvor na Kopilici: Grad znaÄajno povisio vrijednost radova". Slobodna Dalmacija (in Croatian). 25 January 2019. Retrieved 25 January 2019.
- ā "Registration". 19 January 2019. Archived from the original on 21 January 2019. Retrieved 7 July 2023 ā via PressReader.
- ā "Stanovnici Kopilice negoduju zbog premjeÅ”tanjaĀ :: HRT ā Radio Split". radio.hrt.hr (in Croatian). Retrieved 30 January 2019.
- ā Bogdan, Andela (January 2019). "U Splitu se grade novi hoteli, javne garaže i minimetro" (PDF). Gradevinar. 71 (1): 57ā60.
- ā "SPLIT: Rasprava inženjera o Kopilici nije ponudila nove odgovore". Dalmatinski portal. Retrieved 10 February 2019.
- ā "Dragan Žuvela nakon tribine o premjeÅ”tanju kolodvora: 'Improvizacija ispod svakog nivoa' je preblaga reÄenica za ovo!". Dalmatinski portal. Retrieved 10 February 2019.
- ā RADE POPADIÄ; Miroslav Lelas. "Pristigle dvije ponude za izgradnju autobusnog kolodvora na Kopilici, nema Cestara!". DALMACIJA DANAS (in Croatian). Retrieved 20 February 2019.
- ā "JOÅ JEDAN TROÅ AK: Privremeni kolodvor postaje joÅ” skuplji". Dalmatinski portal. Retrieved 20 February 2019.
- ā "Banovina 'Å”minka' HercegovaÄku: ureÄuju se prometnice oko buduÄeg autobusnog kolodvora, evo koliko milijuna kuna Äe SpliÄani platiti ureÄenje samo jednog kilometra ceste". Slobodna Dalmacija (in Croatian). 6 February 2019. Retrieved 20 February 2019.
- ā "Splitskoj tvrtki gradnja kolodvora na Kopilici za 10,7 milijuna kuna? I njihova ponuda premaÅ”ila je procijenjenu vrijednost, ali poteÅ”tatu i povjerenstvu ovoga puta to nije bila prepreka". Slobodna Dalmacija (in Croatian). 21 February 2019. Retrieved 21 February 2019.
- ā ""PlaÄat Äemo parking, neÄe biti zelenila, a ispred kuÄa Äe nam biti gradiliÅ”te": Evo Å”to u vezi s izgradnjom privremenog kolodvora muÄi stanovnike Kopilice". Splitski Dnevnik (in Croatian). 11 February 2019. Retrieved 12 February 2019.
- ā "Stanovnici Kopilice na nogama zbog preseljenja kolodvora: Sprema nam se mala ekoloÅ”ka bomba! Imamo li mi ikakva prava, jesmo li Indijanci u rezervatu?!". Slobodna Dalmacija (in Croatian). 15 February 2019. Retrieved 15 February 2019.
- ā "Stanovnici Kopilice najavili prosvjed, ljuti ih i to Å”to ljudi misle da tu žive nelegalno". Splitski Dnevnik (in Croatian). 15 February 2019. Retrieved 15 February 2019.
- ā "Na Kopilici održan prosvjed, rijeÄi desetogodiÅ”nje Tare posebno su dirnule sve nazoÄne: Nitko od nas ne želi živjeti u strahu, ali nažalost, hoÄemo". Slobodna Dalmacija (in Croatian). 20 February 2019. Retrieved 21 February 2019.
- ā "Blaževski: "GradonaÄelniÄe, odustanite od ishitrenog i nepripremljenog projekta na Kopilici"". DALMACIJA DANAS (in Croatian). Retrieved 20 February 2019.
- ā "Zaustavljen projekt splitskog metroa? Evo Å”to kaže Nino Vela". Dalmatinski portal. Retrieved 12 March 2019.
- ā Miroslav LELAS; RADE POPADIÄ. "Žestoka rasprava na tribini o Kopilici: "Ako se ne bude radilo kako treba, Grad Äe u DAS-u imati najveÄeg neprijatelja"". DALMACIJA DANAS (in Croatian). Retrieved 15 March 2019.
- ā "Gospodarsko vijeÄe HGK - Županijske komore Split održalo sjednicu u ZraÄnoj luci Split". Dalmacija News. 14 March 2019. Retrieved 15 March 2019.
- ā "Kako je zamiÅ”ljen Split buduÄnosti: Kopilica postaje moderan kvart, osim kolodvora gradit Äe se i stanovi te nova riva; Na istoÄnoj obali niÄu hoteli i joÅ” stanova, a planira se i most preko KaÅ”telanskog zaljeva". Slobodna Dalmacija (in Croatian). 18 March 2019. Retrieved 19 March 2019.
- ā "SPLIT UNITED: ProÄitajte Å”to predviÄa nacrt masterplana za Kopilicu i IstoÄnu obalu". Dalmatinski portal. Retrieved 19 March 2019.
- ā "Prvi korak prema novom Splitu: Pokrenut projekt kojemu se nitko ne usuÄuje ni procijeniti vrijednost". tportal.hr. Retrieved 19 March 2019.
- ā "Urbane zone, podzemne garaže i POS na Kopilici zvuÄe super, ali kad ih uopÄe možemo oÄekivati?". Splitski Dnevnik (in Croatian). 18 March 2019. Retrieved 19 March 2019.
- ā "Split United - project presentation".
- ā "Kerum žestoko opleo po Opari: Äelnik HGS-a otvorio duÅ”u, posluÅ”ajte zbog Äega je sve kritizirao gradonaÄelnika". Slobodna Dalmacija (in Croatian). 19 March 2019. Retrieved 20 March 2019.
- ā "Bitno da je ministar zadovoljan kako napreduju radovi: Oleg ButkoviÄ bacio Äir po splitskom aerodromu". Splitski Dnevnik (in Croatian). 19 March 2019. Retrieved 20 March 2019.
- ā "Izrada tehniÄke dokumentacije za izgradnju željezniÄkog stajaliÅ”ta "Split H.B.Z." u km 325+155 pruge M604 OÅ”tarije-Knin-Split i sanaciju tunela Split". eojn.nn.hr. Retrieved 6 May 2019.
- ā Projektni zadatak za izradu tehniÄke dokumentacije za izgradnju željezniÄkog stajaliÅ”ta āSplit H.B.Z.ā u km 325+155 pruge M604 OÅ”tarije-Knin-Split i sanaciju tunela Split
- ā "GRAD KAÅ TELA STAO NA PUT ŽELJEZNICI OD SPLITA DO AERODROMA Traže da se pruga ukopa, a to bi za spornih 10 kilometara stajalo 100 do 200 milijuna ⬠- Jutarnji List". www.jutarnji.hr. 9 September 2019. Retrieved 9 October 2019.
- ā "Mi smo apsolutno za prugu, ali s trasom koja Äe odgovarati KaÅ”telima". lokalni.vecernji.hr (in Croatian). Retrieved 9 October 2019.
- ā "Ovo je novo rjeÅ”enje za spornu dalmatinsku prugu: Kroz KaÅ”tela nadzemno, uz brzu cestu!". tportal.hr. Retrieved 9 October 2019.
- ā "Slobodna Dalmacija - Željeznica - pravi izbor: kada se vlakom povežu Resnik i splitska luka, smanjit Äe se i gužve na cestovnim dionicama". slobodnadalmacija.hr (in Croatian). 11 March 2020. Retrieved 13 May 2020.
Literature
[edit]- Ivanovski, D (2015). Kolodvor Kopilica, Split (Thesis) (in Croatian). Split: SveuÄiliÅ”te u Splitu, Fakultet graÄevinarstva, arhitekture i geodezije.
- LaliÄ, Dean; Å pehar Kroflin, Snježana (2011). "Novo željezniÄko stajaliÅ”te Split H.B.Z. i protupožarna sanacija tunela Split" [New Split H.B.Z. railway station and fire protection renovation of the Split tunnel] (PDF). Željeznice (in Croatian). 21 (10(2)): 21ā24. ISSNĀ 1333-7971.
- MlinareviÄ, M. (2010). "Studija razvoja i unapreÄenja kvalitete usluga gradsko-prigradskog željezniÄkog prijevoza putnika Grada Splita i Splitsko-dalmatinske županije" [Study of the development and improvement of the quality of urban-suburban railway passenger transport services in the City of Split and Split-Dalmatia County] (Document) (in Croatian). HŽ PutniÄki prijevoz/Inženjerski biro/Convena konzalting.
- ViÅ”njiÄ, Vinko; PuÅ”iÄ, Marko; ŽižiÄ, Ivan (2007). "Traffic and Technological Assumptions for the Metro in the City of Split". Promet-Traffic&Transportation. 19 (3).
- VojnoviÄ, Jure (1992). Željeznica Split - Trogir [Split - Trogir railway] (Thesis) (in Croatian). Split: University of Split.
External links
[edit]- Video of a train ride on the Split Suburban Railway on YouTube
- (in Croatian) Article about the new line, with images
- Putnik, Dijana. "Gužve na cestama izbjegavaju vozeÄi se vlakom (FOTO)" (in Croatian). Retrieved 3 May 2018.
- "NeiskoriÅ”teni Prometni 'As Iz Rukava' Vizionarski projekt: Pogledajte kako izgleda nesuÄeni splitski 'metro'". Dalmacija danas (in Croatian). Retrieved 6 April 2016.
- "Putovali smo vlakom od Splita do PerkoviÄa". Slobodna Dalmacija (in Croatian). 17 February 2019. Retrieved 12 March 2019.